MIL-STD-1OOG
(c) Equipment accuracy, limits, and latest date and place of calibration; frequency of calibration; and (when specifically requested) traceability of calibration to national or other recognized standards.
d. Certification that the applicant:
(1) Agrees to be bound by all of the provisions and terms set forth in this standard. (2) Is the manufacturer of the product.
(3) Has determined from actual tests (within the limits of test equipment commonly available, unless otherwise specified) that the product conforms to the applicable drawing. (Test reports
and data should be furnished with the application.)
(4) Will supply items for test which are randomly selected samples from the manufacturer's normal production.
(5) Will supply products which meet the requirements of the drawing in every respect. (6) Is prepared to overcome deficiencies disclosed by qualification tests.
(7) Will not apply for a retest of the product until satisfactory evidence is furnished that all of the defects which were disclosed by previous tests have been corrected. (Test reports may be required as evidence.)
(8) Will not state or imply in advertising or otherwise that a product(s), which has received Department of Defense Qualification Approval, is the only product of that type so qualified, or that the Department of Defense in any way recommends or endorses the product.
(9) Will notify the design activity of any change in his product (design, materials, or process)
after qualification approval. The applicant will also state at the same time, whether:
(a) In his belief the change will or will not prejudice the capability of the product to meet the drawing requirements.
(b) He intends to submit new samples for testing or (after qualification approval) desires to have his company removed from the drawing.
(c) The changes will affect the applicant's brand designation for the product.
(10) Will, when requested by the design activity, submit certification signed by a responsible official of management, attesting that the tested product(s) is still available from the listed plant, can be produced under the same conditions as originally qualified, i.e., same process, materials, design, manufacturer's part number or designation and meets the requirements of the current issue of the drawing.
BS0.3.1 Additional information. In certain cases where information required by B50.3 is considered by the design activity as insufficient to justify authorization for testing or approval as source of supply the applicant will be required to supply at no cost to the Government, the
61
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business